MLS Football Jersey
May 24, 2024

The sports sphere

Wide range of sports activities

The circular road network around Xiangyang National Sports Center has taken shape

2 min read
[Source: Xiangyang City Housing and Urban Construction Bureau_Cee Urban Construction]On April 24th, the Xiangyang National Sports Center was supp

[Source: Xiangyang City Housing and Urban Construction Bureau_Cee Urban Construction]

On April 24th, the Xiangyang National Sports Center was supported by the Municipal Road, Hanguang Avenue (Haoran Hedong Road-Lumen Avenue), Haoran Hedong Road (Hanguang Avenue-Xiao Po River Road) and Xiao Po River Road (Haoran Hedong Road-Lu LugaGate Avenue) Three roads have completed asphalt paving, sidewalk paving, labeling, street lights, signal lights and other installations, greening planting, etc. The site has been opened to traffic. At this point, the circular road network of the National Sports Center has basically formed.

The Xiangyang National Sports Center is a supporting municipal road Han Guangdao Road and Haoran Hedong Road as the main road of the city, and the Xiaopo River Road is the city’s secondary road.Hanguang Avenue (Haoran Hedong Road-Lumen Avenue) has a total length of 480 meters and 70 meters wide. It adopts a two-way 6-lane design; Haoran Hedong Road (Hanguang Avenue-Xiao Po River Road) has a total length of 850 meters and 50 meters wide. It is used.The two-way 6-lane design; Xiaopo River Road (Haoran Hedong Road-Lumen Avenue) roads are 759 meters long and 42 meters wide. Both 6-lane design is used.

According to the relevant responsible comrades of the Urban and Rural Construction Bureau of Dongjin New District, in order to ensure that Lutong, Jingmei, and Function of the National Sports Center of Xiangyang are ensured before the application of the National Sports Center of Xiangyang, the main body of responsible entities of the five parties of Hanguang Avenue, Haoran Hedong Road, and Xiao Po River Road cooperate with the parties., Overcoming difficulties, paying close attention to the goals, refining measures, inverted construction period, strict control, under the premise of ensuring safety, reasonably adjust the allocation of resource allocation, suddenly fight day and night, and build high -efficiency construction.Construction of supporting roads, make every effort to build boutique projects, and contribute to the construction of new urban centers.

Copyright © All rights reserved. | Newsphere by AF themes.
MLS Football Jersey